EasyManua.ls Logo

Eaton Powerware 9355 - 9 Parallel Communication

Eaton Powerware 9355
100 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
EATON Powerware
®
9355 UPS (20/30 kVA) Installation and Operation Manual S 164201626 Rev B www.powerware.com
61
Chapter 9 Parallel Communication
The Powerware Hot Sync CAN Bridge Card, shown in Figure 43, can be installed to
provide connectivity for operational mode control and metering of a parallel system at
any UPS in the system.
Plug-in Terminal Block
Figure 43. Powerware Hot Sync CAN Bridge Card
To install the Powerware Hot Sync CAN Bridge Card:
1. Remove the UPS front door (see page 10).
2. Remove the communication wiring access plate from the UPS rear panel and
punch a hole in it using a Greenlee punch or similar device (see Figure 44).
3. Install conduit for the communication wiring.
Communication
Wiring Access Plate
Figure 44. Communication Wiring Access

Table of Contents

Other manuals for Eaton Powerware 9355

Related product manuals