COMMUNICATION
EATON Powerware
®
9355 UPS (20/30 kVA) Installation and Operation Manual S 164201626 Rev B www.powerware.com
48
Installing Communication Options and Control Terminals
NOTE To install a CAN Bridge Card, see “Parallel Communication” on page 61.
To access and install the communication options and control terminals:
1. Remove the UPS front door (see page 10).
2. Install the appropriate X-Slot card and/or necessary cables into the ports (see
Figure 32 and Figure 33).
3. Route the control terminal cable(s) through the middle of the fan section and
secure in the cable clips.
Cable Clips for Control
Terminal Wiring
Figure 33. Installing Communication Cables