EasyManua.ls Logo

Ecotechnics SUN ECK TWIN 12 - Vacuum

Ecotechnics SUN ECK TWIN 12
111 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTRUCTIONS MANUAL
-39-
VACUUM
Use the quick-connect couplings to connect the hoses to the A/C system, bearing in mind that
BLUE must be connected to the low pressure side and RED to high pressure. If the system is
equipped with a single quick-connect coupling for high or low pressure, connect only the
relative hose.
From the MANUAL PROCEDURE, select VACUUM.
The following screen will be displayed:
Use the KEYPAD to insert the new value of the VACUUM TIME, press ENTER to confirm,
ESC to return back.
NOTE: if selected VACUUM TIME is lower 15 minutes the following popup warning will be
displayed:
Vacuum time
(Min 2, Max 120 min)
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _
ESC
ENTER
ENTER
DD/MM/YY XX:XX PM
RECOVERY/RECYCLE
VACUUM
OIL INJECTION
CHARGE
ESC
MANUAL
FLUSHING HOSES
VACUUM
DD/MM/YY XX:XX PM
ENTER
ESC
VACUUM TIME
25

Table of Contents

Related product manuals