SE-1 Electrocardiograph User Manual Operation Preparations
- 28 -
4.6 Inspection Before Power-On
In order to avoid safety hazards and get good ECG records, the following inspection procedure
is recommended before power-on and operation.
1) Environment:
♦ Make sure that there is no electromagnetic interference source around the equipment,
especially large medical electrical equipment such as electrosurgical equipment,
radiological equipment, magnetic resonance imaging equipment etc. Switch off these
devices when necessary.
♦ Keep the examination room warm to avoid muscle tremor caused by cold.
2) Power Supply:
♦ If the mains supply is used, please check whether the power cord is connected to the
unit well. The grounded three-slot outlet should be used.
♦ When the battery capacity is low, recharge the battery before use.
3) Patient Cable:
♦ Make sure that the patient cable is connected to the unit firmly, and keep it far away
from the power cord.
4) Electrodes:
♦ Make sure that all electrodes are connected to lead wires of the patient cable
correctly.
♦ Make sure that all electrodes are connected to the patient correctly.
♦ Ensure that the chest electrodes do not contact.
5) Recorder Paper:
♦ Ensure that there is enough recorder paper loaded correctly.
♦ Make sure that the recorder casing is secured.
6) Patient:
♦ The patient should not come into contact with conducting objects such as earth, metal
parts etc.
♦ Ensure that the patient is warm and relaxed, and breathes calmly.