Pre-service
Unpack and inspect
Remove all packaging and check that all items listed in Table 1 on page 8 have been
received. If any of these items are missing, nofy the supplier in wring within three days.
Table 1
Checklist of components for the bearing exchange tool kit B8G200845
Quanty Descripon Reference Check
1 Pin spanner adaptor Figure 1 on
page 8
❏
1 Bearing module extractor tool Figure 2 on
page 8
❏
1 Bearing preload measurement and seng
tool
Figure 3 on
page 9
❏
Figure 1
Pin spanner adaptor
1. ¼” square drive
Figure 2
Bearing module extractor tool
1. Bearing an-rotang tube 2. Bearing extractor sleeve
B8G2-00-840A - Pre-service
Page 8