Connecon for remote control and monitoring
To oper
ate the pump using parallel or serial control, the 15-way D-type connector must be
used (Figure 1 on page 11, item 8).
Refer to Figure 4 on page 23 for full details of the logic interface pins.
Connect the logic interface to the control equipment
The pump can be controlled using a hardware parallel control interface and / or via
commands sent over a serial interface.
To control the pump using the hardware parallel interface, refer to Parallel and serial control
mode on page 22 for more informaon. To control the pump using the serial interface,
please contact Edwards for further informaon.
Addional safety equipment
Install suitable measurement equipment in the nitrogen supply pipeline if the process tool/
control system needs to know the total ow rate of nitrogen to the pump for safety reasons.
Commissioning
1. Switch on the external electrical supply. Switch the mains circuit breaker (Figure 1
on page 11, item 9) to the ON posion and check that the power indicator LED
(Figure 2 on page 12, item 6) illuminates. If the LED does not illuminate, contact
Edwards.
2. Switch on the nitrogen supply, if required.
3. Ensure that the exhaust extracon system is not blocked (for example, that valves in
the exhaust extracon system are open).
4. Ensure that all openings to atmospheric pressure in the foreline vacuum system are
closed.
5. Momentarily press the start buon (Figure 2 on page 12, item 2) unl the run
indicator LED (Figure 2 on page 12, item 1) comes on and remains illuminated.
6. If the dry pumping system starts and connues to operate, connue at Step 7. If an
alarm condion is indicated:
a) Shut down the dry pumping system: refer to Shut down the pump on page 25
for shut down procedure.
b) Contact Edwards.
7. Aer commissioning the dry pumping system:
a) T
o connue to operate the system, refer to Start the pump on page 24 .
b) To shut down the system, refer to Shut down the pump on page 25 for shut
down procedure.
A770-10-880A - Installaon
Page 20