!! 2) Install the docking station on the grass, in your mowing area:"
• Place the docking station on the grass, at the edge of the grass."
• Make sure there is a half-circle with 12 feet or 3 meter radius of clearance in front
of the docking station."
• Secure the docking station by inserting the 3 pins."
• Plugin the charger station power cord."
We strongly recommend purchasing the EEVE charging station base plate when setting
up the docking station for your personal robot. This accessory ensures a secure
and stable connection, promoting optimal charging performance. The base plate
can be acquired via our accessories shop at eeve.com or by reaching out to our
support team at support@eeve.com."
For any of the chosen installation option, make sure:"
• The docking station is installed on a flat surface, with minimum 11 square feet or one
square meter of flat area in front of the docking station. The flat surface needs to
be 0° horizontal flat, water-level.#