EasyManua.ls Logo

efacec EFAPOWER EV PC G2 - 5.3.4.2 ANCHORING TO THE FLOOR

efacec EFAPOWER EV PC G2
44 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
E F A P O W E R E V - PC - I N S T A L L A T I O N A N D U S E R M A N U A L
17 | 37
5.3.4.2 ANCHORING TO THE FLOOR
The EFAPOWER EV-PC is prepared to be fixed to the floor, however, to do so it’s required the use of a Pedestal
or Pedestal with door.
Each unit must be installed by using 4 (four) anchors, M8 length must comply with local codes.
In the following figures some details are shown regarding the drilling layout for the Unit.
Only 4 (four) points are needed to mount each Unit on the floor (marked with a red circle).
Depending on the configuration of the EFAPOWER EV-PC, we have different cable entry points, which are
represented in the following two figures. The cable entry shall respect the place that was assigned to it (market
with green).
CE and GB MARKED UNITS:
Cable gland M40: AC input (refer to Chapters 5.3.4.3 and 5.3.4.4)
Cable gland M25 (for connections between central and satellite units): communication cable (refer to
Chapter 5.3.4.5)
Figure 12 - EFAPOWER EV-PC CE / GB with pedestal Drilling and conduits Layout
(bottom view)
Front Side

Related product manuals