EasyManua.ls Logo

Emerson GXT4-5000RT230 - 2.0 Installation; 2.3 Preparation for Installation; 2.4 Install the Main Cabinet; 2.5 External Battery Cabinet Installation

Emerson GXT4-5000RT230
68 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation
13 Liebert
®
GXT4
User Manual
2.0 Installation
Do NOT attempt to start the UPS, turn on any circuit breaker or energize the input power until instructed to
do so in 4.2 - Starting the UPS.
2.1 Unpacking and Inspection
Unpack the UPS and conduct the following checks:
Inspect the UPS for shipping damage. Report any shipping damage to the carrier and your local dealer
or Emerson
®
representative immediately.
Check the accessories against the delivery list. If there is any discrepancy, contact your local dealer or
your Emerson representative immediately
2.2 What’s Included
The Liebert GXT4 is shipped with the following items:
Terminal Block Communication terminals
Compact Disk with
Liebert MultiLink
®
Configuration program
User manual (electronic version)
Liebert IntelliSlot Unity card (IS-UNITY-DP), factory installed (not included with units with model
number ending with an “E”)
USB cable, one; 1.2 m (3.9 ft.)
Rack mounting hardware including screws, handles, and mounting rail kit
(not included with units with model numbers ending with an “E”)
Power Distribution Box, installed on Liebert GXT4
Support base set, one
Warnings, Safety Instructions booklet and WEEE recycling sheet (ISO 14001 compliance)
!
CAUTION
The UPS is heavy (see 8.0 - Specifications). Take proper precautions when lifting or
moving it.
NOTE
The GXT4 External Battery Cabinet shipping package includes one battery cabinet, two spacers
for tower configuration, one DC power cable and rack mounting hardware, including screws,
handles and mounting rail kit (not included with model numbers ending with “E”).

Table of Contents

Related product manuals