October 2020
Installation, Operation and Maintenance Manual
MAN-10-04-100-0711-EN Rev. 0
18
Installation
Section 4: Installation
Table 3. Current Absorption - Single Phase and DC Voltage
NOTE
1. A = absorbed current (Amp) at nominal conditions (output torque 100%)
2. Max current (Amp) at stall conditions = 1.2 x A
3. Power factor for V AC supply = 0.60
4. Peak current: max 8xIn
5. Peak current duration: less than 0.1 s
Table 4. Current Absorption - Three Phase Voltage
Model
Selected
Step
Oper. Time
(secs/90°)
Current Absorption (A)
208 V AC 240 V AC 380 V AC 400 V AC 480 V AC 500 V AC 575 V AC
063/E006
8 15 0.226 0.176 0.107
6 28 0.165 0.101 0.080
4 48 0.132 0.083 0.057
125/E013
8 15 0.344 0.227 0.171
6 28 0.295 0.180 0.143
4 48 0.245 0.155 0.125
250/E025
8 15 0.800 0.73 0.52 0.49 0.37 0.340
6 28 0.590 0.56 0.41 0.35 0.29 0.280
4 48 0.530 0.50 0.37 0.30 0.27 0.250
500/E051
8 15 1.073 0.97 0.65 0.58 0.46 0.430
6 28 0.720 0.64 0.47 0.39 0.32 0.310
4 48 0.590 0.55 0.41 0.32 0.29 0.280
1000/E091
8 24 1.073 0.97 0.65 0.58 0.46 0.430
6 45 0.720 0.64 0.47 0.39 0.32 0.310
4 80 0.590 0.55 0.41 0.32 0.29 0.280
2000/E171
8 53 1.073 0.97 0.65 0.58 0.46 0.430
6 100 0.720 0.64 0.47 0.39 0.32 0.310
4 180 0.590 0.55 0.41 0.32 0.29 0.280
Model
Selected
Step
Oper.
Time
(
secs/90
°)
Current Absorption (A)
24 V
AC
48 V
AC
90 V
AC
110 V
AC
230 V
AC
264 V
AC
24 V
DC
48 V
DC
90 V
DC
110 V
DC
230 V
DC
264 V
DC
063/E006
8 15 2.26 1.01 0.590 0.473 0.334 0.289 2.02 1.01 0.605 0.476 0.222 0.196
6 28 1.60 0.84 0.405 0.334 0.253 0.217 1.53 0.75 0.415 0.343 0.158 0.138
4 48 1.38 0.73 0.317 0.265 0.209 0.176 1.30 0.64 0.318 0.260 0.120 0.106
125/E013
8 15 4.20 1.70 0.980 0.810 0.430 0.420 4.50 1.81 1.040 0.820 0.390 0.340
6 28 2.60 1.28 0.780 0.630 0.370 0.340 2.65 1.27 0.810 0.640 0.300 0.260
4 48 2.04 1.00 0.680 0.560 0.340 0.290 2.10 0.96 0.720 0.570 0.270 0.220
250/E025
8 15 10.30 4.90 2.440 1.970 0.920 0.800 9.70 4.80 2.520 1.950 0.900 0.780
6 28 8.20 3.80 1.650 1.350 0.640 0.570 7.20 3.60 1.650 1.320 0.630 0.540
4 48 6.40 3.30 1.440 1.170 0.560 0.500 6.80 3.20 1.460 1.140 0.540 0.470
500/E051
8 15 14.50 6.80 3.200 2.520 1.150 1.000 14.00 7.00 3.220 2.530 1.120 0.980
6 28 9.50 4.60 1.900 1.550 0.760 0.670 9.30 4.50 1.920 1.540 0.720 0.620
4 48 7.00 3.40 1.550 1.240 0.600 0.530 7.10 3.40 1.510 1.240 0.580 0.500
1000/E091
8 24 14.50 6.80 3.200 2.520 1.150 1.000 14.00 7.00 3.220 2.530 1.120 0.980
6 45 9.50 4.60 1.900 1.550 0.760 0.670 9.30 4.50 1.920 1.540 0.720 0.620
4 80 7.00 3.40 1.550 1.240 0.600 0.530 7.10 3.40 1.510 1.240 0.580 0.500
2000/E171
8 53 14.50 6.80 3.200 2.520 1.150 1.000 14.00 7.00 3.220 2.530 1.120 0.980
6 100 9.50 4.60 1.900 1.550 0.760 0.670 9.30 4.50 1.920 1.540 0.720 0.620
4 180 7.00 3.40 1.550 1.240 0.600 0.530 7.10 3.40 1.510 1.240 0.580 0.500