EasyManua.ls Logo

Endress+Hauser Cerabar M PMC51 - Installing Deltabar M; Installation position

Endress+Hauser Cerabar M PMC51
32 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation Cerabar M PMC51, PMP51, PMP55
18 Endress+Hauser
6.1.2 Operation with an operating menu
Operation with an operating menu is based on an operation concept with "user roles"
→  20.
Operation methods Explanation Graphic Description
Local operation with
device display
The device is operated using the
operating keys on the device display.
E
+
A0029999
→  20
Remote operation via
FieldCare
The device is operated using the
FieldCare operating tool.
A0030002
→  25
6.1.3 IO-Link
IO-Link information
IO-Link Smart Sensor Profile 2nd Edition
Supports
Identification
Diagnosis
Digital Measuring Sensor (as per SSP 4.3.3)
IO-Link is a point-to-point connection for communication between the measuring device and
an IO-Link master. The measuring device features an IO-Link communication interface type 2
(pin 4) with a second IO function on pin 2. This requires an IO-Link-compatible assembly (IO-
Link master) for operation. The IO-Link communication interface enables direct access to the
process and diagnostic data. It also provides the option of configuring the measuring device
while in operation.
Characteristics of the IO-Link interface:
IO-Link specification: Version 1.1
IO-Link Smart Sensor Profile 2nd Edition
Speed: COM2; 38.4 kBaud
Minimum cycle time: 10 ms
Process data width: 14 Byte

Other manuals for Endress+Hauser Cerabar M PMC51

Related product manuals