EasyManua.ls Logo

Endress+Hauser Deltabar S PMD75 - Post-Installation Check

Endress+Hauser Deltabar S PMD75
52 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Deltabar S FOUNDATION Fieldbus Installation
Endress+Hauser 21
4.3.10 Closing the housing cover
NOTICE
Devices with EPDM cover seal - transmitter leakiness!
Mineral-based, animal-based or vegetable-based lubricants cause the EPDM cover seal to swell
and the transmitter to become leaky.
The thread is coated at the factory and therefore does not require any lubrication.
NOTICE
The housing cover can no longer be closed.
Damaged thread!
When closing the housing cover, please ensure that the thread of the cover and housing are
free from dirt, e.g. sand.If you feel any resistance when closing the cover, check the thread
on both again to ensure that they are free from dirt.
Closing the covers on the hygienic stainless steel housing (T17)
P01-PMD75xxx-17-xx-xx-xx-000
Fig. 4: Closing the covers
The covers for the terminal and electronics compartment are hooked into the housing and
closed with a screw. These screws should be tightened handtight (2 Nm (1.48 lbf ft)) to the stop
to ensure that the covers sit tightly.
4.4 Post-installation check
After installing the device, carry out the following checks:
Are all screws firmly tightened?
Are the housing covers screwed down tight?
Are all locking screws and vent valves firmly tightened?
+

Other manuals for Endress+Hauser Deltabar S PMD75

Related product manuals