EasyManua.ls Logo

Endress+Hauser Liquistation CSF33 - Page 17

Endress+Hauser Liquistation CSF33
180 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Liquistation CSF33 Installation
Endress+Hauser 17
5.1.3 Mechanical connection
Foundation plan
302 (11.9)
195.4 (7.69)
C
C
D
B
A
A
AA
137.4 (5.41)
355 (14.0)
61 (2.4)
605 (23.8)
730 (28.7)
786 (30.9)
214 (8.43)
255 (10.0)
311 (12.2)
305 (12.0)
33.6 (1.32)
A0024406
 6 Foundation plan
A Fasteners (4 x M10)
B Cable inlet
C Outlet for condensate and overflow > DN 50
D Sample supply from below > DN 80
--- Dimensions of Liquistation
5.1.4 Connection for suctioning samples
Maximum suction height:
Vacuum pump: Standard 6 m (20 ft)
Peristaltic pump: standard 8 m (26 ft)
Maximum hose length: 30 m (98 ft)
Hose connection diameter
Vacuum pump: 13 mm (1/2")
Peristaltic pump: internal diameter of 10 mm (3/8")
Intake speed:
> 0.6 m/s (> 1.9 ft/s) for 10 mm (3/8") ID, as per Ö 5893, US EPA
> 0.5 m/s (> 1.6 ft/s) for ≤ 13 mm (1/2") ID, in accordance with EN 25667, ISO 5667
Note the following when erecting the device:
Always route the suction line so that it slopes upwards from the sampling point to the
sampler.
The sampler must be located above the sampling point.
Avoid siphoning effects in the suction line.

Table of Contents

Other manuals for Endress+Hauser Liquistation CSF33

Related product manuals