EasyManua.ls Logo

Endress+Hauser Soliwave FDR56 - Page 20

Endress+Hauser Soliwave FDR56
56 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Soliwave FQR56/FDR56
Installation
20
Endress+Hauser
Installation procedure:
Screw the R 1½ or 1½ NPT self-sealing connecting thread into the process.
55 mm (AF)
Align the FQR56 and FDR56 with one another (the two devices must be positioned with
their front faces facing one another on the same axis).
Fix the housing in place.
2 mm
5�2�2 Installation with a non-self-sealing connecting thread (G 1½)
1
2
3
4
5
6
11 Installationwithanon-self-sealingconnectingthread
Installation procedure:
Screw the G 1½ non-self-sealing connecting thread into the process along with the
process seal provided.
55 mm (AF)
Tighten the lock nut on the thread.
55 mm (AF)
Align the FQR56 and FDR56 with one another (the two devices must be positioned with
their front faces facing one another on the same axis).

Other manuals for Endress+Hauser Soliwave FDR56

Related product manuals