Soliwave FQR56/FDR56
Commissioning
34
Endress+Hauser
8 Commissioning
8�1 Installation and function check
Make sure that the post-installation and post-connection checks have been carried out before
you commission your measuring point:
•"Post-installationcheck"checklist→21
•"Post-connectioncheck"checklist→29
Youcanwritedownallselectedsettingsfordocumentationpurposes(table→53).
8�2 Switching on the device
The microwave barrier will be switched on by an applied power supply on FQR56 transmitter
and FDR56 transceiver.
The green LED glows on both devices when power supply is applied.
8�3 Conguringthedevice
The microwave barrier can be calibrated on the FDR56. The setup can be made on free or
covered path. Therefore there are functions for automatic and manual setup available.
Formostapplicationstheautomaticsetupissucient.
Additional settings for optimal adaptation
→37
Setup parallel operation mode
→33
8�3�1 Calibration with free or minimum covered path (function 1)
This automatic setup function can be used if the path is free or minimum covered.
Set encoding switch to Position 1
→Displayofthefunctionnumber
Aer2seconds:Displayofthecurrentsignalstrength,example:
Simultaneously press the and keys on the device with free or minimum covered path
→Automaticcalibrationiscarriedout
→Displayofthesignalstrengthwithmaximumsolidow
Move the encoding switch to the initial position 0
→Displayofthecurrentsignalstrength