EasyManua.ls Logo

Enterasys SecureStack B2 B2G124-24 - Chapter 3: Hardware Installation; Considerations Prior to Installation; Required Tools; Unpacking the Switch

Enterasys SecureStack B2 B2G124-24
80 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Considerations Prior to Installation
3-2 Hardware Installation
Considerations Prior to Installation
Wheninstallingtheswitch,notethefollowing:
•Beforestartingtheinstallationprocedure,notifythenetworkadministratorofthe
installation.
•Followtheinstallationproceduresintheorderaspresentedinthisguide.
•DonotconnecttheswitchtothenetworkuntilyouhaveestablishedthecorrectIP
address.
Required Tools
APhillipsscrewdriverisrequiredtoinstalltheswitchintoarack.
Unpacking the Switch
Unpacktheswitchasfollows:
1. Opentheboxandremovethepackingmaterialprotectingtheswitch.
2. VerifythatthecontentsofthecartoncontainstheitemslistedinTable 31.
3. Removethetapesealonthenonconductivebagtoremovetheswitch.
4. Performavisualinspectionofthesw itchforany
signsofphysicaldamage.Contact
Enterasys N etworksifthereareanysignsofdamage.RefertoGettingHelpon
page 1 8fordetails.
Table 3-1 Contents of Switch Carton
Item Quantity
B2G124-24, B2G124-48, or B2H124-48 Switch 1
Mounting kit (two mounting brackets and eight M3x6-mm screws for rack mounting) 1
Rubber feet with adhesive backing for installation on a flat surface 4
AC power cord (The type of power cord is country dependent.) 1
This installation guide 1
Customer Release Notes 1
URL notice card 1

Table of Contents

Related product manuals