Do you have a question about the Enterasys SecureStack C2 C2G124-24 and is the answer not in the manual?
Explains how to connect switches for high-speed stacking operations using rear panel connectors.
Provides contact information for technical support and document feedback channels.
Lists important points to consider before starting the hardware installation process.
Guides on installing optional Mini-GBIC modules into the switch's SFP slots.
Instructions for mounting the switch on a flat surface, including rubber feet placement.
Outlines site requirements, environmental considerations, and stability checks for rack mounting.
Details the process of attaching mounting brackets and securing the switch in a standard 19-inch rack.
Information on understanding switch operation and installation procedures within a stack.
Provides procedures for installing new stacks or adding switches to existing ones.
Instructions for connecting the switch to an AC power source, including power cord details.
Details connecting an optional Redundant Power Supply (RPS) to the switch for power redundancy.
Explains the switch initialization process after connecting stacking cables and applying power.
Lists the necessary DTE interface cables for console port connections to PCs, terminals, or modems.
Steps to connect a PC to the switch console port using VT emulation for management.
Steps to connect a VT Series terminal to the switch console port for management.
Provides a checklist of common problems, possible causes, and recommended actions for resolution.