EasyManua.ls Logo

Enterasys SecureStack C2 C2G124-24 User Manual

Enterasys SecureStack C2 C2G124-24
78 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Enterasys
®
SecureStack
C2
Gigabit and Fast Ethernet Switches
Hardware Installation Guide
C2G124-24
C2G124-48
C2H124-48
P/N 9033951-06
7.5x9-inch cover with bleed on 4 sides

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Enterasys SecureStack C2 C2G124-24 and is the answer not in the manual?

Enterasys SecureStack C2 C2G124-24 Specifications

General IconGeneral
BrandEnterasys
ModelSecureStack C2 C2G124-24
CategorySwitch
LanguageEnglish

Summary

Regulatory Compliance Information

Electromagnetic Compatibility (EMC)

Safety Information

About This Guide

Chapter 1: Introduction

High-Speed Stack Connections

Explains how to connect switches for high-speed stacking operations using rear panel connectors.

Getting Help

Provides contact information for technical support and document feedback channels.

Chapter 2: Network Requirements

Chapter 3: Hardware Installation

Considerations Prior to Installation

Lists important points to consider before starting the hardware installation process.

Installing Optional Mini-GBICs

Guides on installing optional Mini-GBIC modules into the switch's SFP slots.

Installing the Switch on a Flat Surface

Instructions for mounting the switch on a flat surface, including rubber feet placement.

Rack Mounting the Switch

Guidelines for Rackmount Installation

Outlines site requirements, environmental considerations, and stability checks for rack mounting.

Attaching Brackets and Installing in Rack

Details the process of attaching mounting brackets and securing the switch in a standard 19-inch rack.

Connecting High-Speed Stacking Cables

Configuring Switches in a Stack

Information on understanding switch operation and installation procedures within a stack.

Recommended Procedures for New and Existing Stacks

Provides procedures for installing new stacks or adding switches to existing ones.

Connecting AC and RPS Power

AC Power

Instructions for connecting the switch to an AC power source, including power cord details.

RPS Power

Details connecting an optional Redundant Power Supply (RPS) to the switch for power redundancy.

Stack Initialization Overview

Explains the switch initialization process after connecting stacking cables and applying power.

Connecting to Console Port for Local Management

What Is Needed

Lists the necessary DTE interface cables for console port connections to PCs, terminals, or modems.

Connecting to an IBM or Compatible Device

Steps to connect a PC to the switch console port using VT emulation for management.

Connecting to a VT Series Terminal

Steps to connect a VT Series terminal to the switch console port for management.

Connecting to the Network

Completing the Installation

Chapter 4: Troubleshooting

Troubleshooting Checklist

Provides a checklist of common problems, possible causes, and recommended actions for resolution.

Appendix A: Specifications

Related product manuals