EOS Cubo / Cubo Avantgarde - Installation and Operating Instructions EN-29
Installation
2 Pull the connecting cable with the sheath through the cable feed open-
ing.
3 Attach the 2-core line for the safety temperature limiter to both termi-
nals.
4 Screw in the feed opening.
5 Fix the cover of the safety temperature limiter in place again and tighten
the screws.
On the control unit, this safety temperature limiter (on the heater)
must be switched on in sequence with the safety temperature limiter
on the cabin ceiling. For more information, see the installation in-
structions for the control unit.
6 Fix the terminal box cover in place again and fix with 2 screws.
7 Reattach the design cover and screw it in place.
Setting up the heater
1 Move the heater to the desired position.
2 Attach the heater guard rail.
The heater guard rail (touch guard) is mandatory. For installation in-
formation, see 3.1.1 Installation site, EN-21
3 Guide the cable from the cabin to the sauna control unit.
Leave sufficient cable inside the sauna to allow the heater to be
moved away from the wall for maintenance.
4 Connect all cables to the control unit in accordance with its installation
instructions.