Hydraulic Rock Drill COP RR14 / SC14 Ver. C 10 Front Head
44 No: 4124851851.2.9007203379904011 en-US
2.
Align the flushing head hole with the front head hole, use tool A5 to press in the flush-
ing head (121).
a.
Make sure the flushing holes in the flushing head and the front head aligns.
3.
Install o-ring (105), flushing adapter (104), and nipple (15).
4.
Install the washer (103).