EasyManua.ls Logo

Epson Perfection4180 Photo - Page 86

Epson Perfection4180 Photo
88 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
EPSON Perfection4180 Photo Revision A
APPENDIX ADF; Disassembly 86
Figure 7-34. Right Feed Roller Assembly Securing Hook Position
Figure 7-35. Compression Spring 1.66 Temporarily Securing Position
C H E C K
P O I N T
After reinstalling the right Feed Roller Assembly to the ASF
Frame, make sure that the right Feed Roller Assembly is
securely locked by the Hook in the right side rear part of the
ASF Frame.
Before reinstalling the ASF Hopper Assembly to the Feed
Roller Assemblies, set and temporarily secure the Compression
Springs 1.66 to the Spring Mounting Hooks of the Feed
Assembly. After assembling, move the Feed Roller Assemblies
to the hole positions in the rear of the ASF Frame, and release
the Compression Springs 1.66 from the temporarily securing
Hooks through the holes.
Securing Hook
Spring Securing Hook
Compression Spring 1.66

Related product manuals