EasyManua.ls Logo

eversense XL - Page 127

eversense XL
164 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
125
Eversense XL CGM User Guide
17
Q: Why was my calibration rejected?
A: The system will reject the calibration for the any of
the following reasons:
The blood glucose reading entered is less than
2.2 mmol/L.
The blood glucose reading entered is greater than
22.2 mmol/L.
The blood glucose reading entered is significantly
dierent from the last sensor glucose reading.
If the calibration is rejected, you must re-calibrate.
You may need to wait up to 60 minutes before
re-calibrating.
Q: Can I calibrate earlier than my scheduled time?
A: You can calibrate up to 2 hours before the scheduled
time. If you miss your scheduled time, the system will
send an hourly calibration prompt. To view the next
available calibration time, tap Menu > Calibrate.
The next scheduled calibration time is displayed.
Q: What time should I enter on the CALIBRATE
screen when I am notified to calibrate?
A: Enter the time you tested your blood glucose with
your meter. You must enter the blood glucose reading
within 10 minutes of doing the test.
Q: Where can I find details for Calibration Phase,
number of calibrations and last calibration date
and time?
A: You can view calibration details by tapping Menu >
About > My Transmitter.
Q: What are the dierent types of calibration phases?
A: The Eversense XL CGM System has two types of
Calibration Phases, the Initialisation Phase and the
Daily Calibration Phase. Initialisation Phase begins
24 hours after sensor insertion and requires
4 fingerstick blood glucose tests for calibration. The
Daily Calibration Phase occurs after the Initialisation
Phase and requires 2 daily calibrations (morning and
evening) for the life of the sensor.

Table of Contents

Other manuals for eversense XL

Related product manuals