EasyManua.ls Logo

eversense XL - Page 46

eversense XL
164 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
44
Eversense XL CGM User Guide
6
B. Daily Calibration Phase
The Daily Calibration Phase requires 2 blood glucose meter tests at the scheduled morning and evening calibration
times. The first Daily Calibration Phase will begin after successful completion of the Initialisation Phase.
Y our system will automatically tell you when it is time to perform the twice-daily calibration test.
Daily Calibration times must be spaced 10 to 14 hours apart.
The system allows the calibration test to be taken up to 2 hours before the scheduled time. If you miss your
scheduled calibration time, the system will prompt you hourly.
The CALIBRATE screen provides the next allowable calibration time.
Note: If a Daily Calibration test is missed, no additional CGM readings will be displayed after 16 hours have elapsed
since the last accepted calibration result. If a calibration test result is not entered within 24hours from the last
accepted calibration, the system will re-enter the Initialisation Phase.

Table of Contents

Other manuals for eversense XL

Related product manuals