174
FUEL SYSTEM
FUEL COMPONENT SERVICING
Place gasket on throttle body. Install throttle body
on reed plate and install screws.
Tighten the center screws first and expand out-
ward. Final torque is 60 to 120 in. lbs. (7 to 13.5
N·m).
Install upper main bearing vent hose and secure
with tie strap.
Connect throttle linkage and electrical connectors.
Place clamp as shown.
Refer to TPS Calibration on p. 143.
IMPORTANT: DO NOT lubricate throttle link-
ages.
002501
1. Throttle linkage
2. Clamp
002500
2
1