78
G-10
R
SERVICE INTERVALS
Main components Part No.
Months (Cycles)
6 (12500) 12 (25000) 18 (37500) 24 (50000)
Boiler
Non suction valve
C65000200
Replace Replace
1/4 X 1/4 Electrovalve Parker
220V
C60000100
Replace
Thermics Sup. Adaptor 1/2 X 1/2 C30000200
Check Replace
Thermics Inf. Adaptor-
1/2X1/2X1/4
C30000210
Check Replace
Cone Injector 1/4
C30000220
Check Replace
Brewing group
Gro Head Electrov. Parker 220V C60000112
Replace
Showers
C75000010
Replace Replace Replace Replace
8mm group head gasket C75000081
Replace Replace Replace Replace
Taps
Steam tap body
C15000325
Clean Replace
Water tap body
C15000325
Replace
Motor-pump
Pump head
C60000030
Replace
Retention Valve C65000010
Replace
Pump Bypass Condor C30400055
Replace
G-10 Mini Control 1Gr & 2Gr
Important:
6 months service interval for joints and showers of the brewing group is estimated for a machine where
cleaning was carried out properly. Never use excessive force to try to close the porta-filter on the
brewing group.