EasyManua.ls Logo

Extreme Networks Summit X150 Series - Installing the Switch in a Four-Post Rack

Extreme Networks Summit X150 Series
512 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installing a Summit X480 Series Switch
Summit Family Switches Hardware Installation Guide
263
Installing the Switch in a Four-Post Rack
To install the switch in a four-post rack:
1 At the back of the rack, attach a rear mounting bracket to each rear post, as shown in Figure 208.
Figure 208: Attaching Rear Mounting Brackets—Four-Post Installation
2 Attach an ESD-preventive wrist strap to your wrist and connect the metal end to an appropriate
ground point on the rack.
3 Set the switch on a secure work surface.
4 At the front of the switch, attach a rack-mounting bracket to each side as shown in Figure 209.
Position the bracket with the flange at the front edge of the switch.
Figure 209: Attaching a Front Mounting Bracket
SH_145
SH_143

Table of Contents

Related product manuals