EasyManua.ls Logo

Extreme Networks Summit X150 Series - Installing a Summit 750 W AC Power Supply into the EPS-C2

Extreme Networks Summit X150 Series
512 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 7: Installing Summit External Power Supplies
Summit Family Switches Hardware Installation Guide
324
Figure 266: Sliding the EPS-C2 into the Rack and Securing it
Installing a Summit 750 W AC Power Supply into the EPS-C2
The EPS-C2 chassis is shipped with slots 2 and 3 covered and slot 1 open. Extreme Networks
recommends that you install a power supply first in slot 1, but this is not required. You can install
power supplies into any of the slots in the EPS-C2 chassis. The installation sequence does not affect the
performance of the power supply units, but empty slots must be covered at all times.
WARNING!
To prevent an electrical hazard, make sure that the AC power cord is not connected to the power supply
before you install the power supply in the power supply bay.
EPS_CS210

Table of Contents

Related product manuals