Chapter 6: Installing Summit Family Switches
Summit Family Switches Hardware Installation Guide
296
a Strip 0.25 inch from the end of the AWG # 14 copper wire.
b Securely crimp the provided ring terminal onto the stripped wire.
c Insert the provided M4 screw through the ring terminal and into the grounding stud on the front
of the switch (Figure 243).
d Securely tighten the screw.
Figure 243: Grounding a Summit X670 Series Switch
The Summit X670 series switch is shipped without installed power supplies. You can install two power
supplies for a redundant power configuration. After the switch is secured to the rack, install the
necessary power supplies for your configuration. For instructions, see the following pages:
● Installing a 450 W or 550 W AC power supply: page 265
● Installing a 450 W or 550 W DC power supply: page 268
NOTE
If you are installing a VIM4 module in the Summit X670V-48x switch, install it in the switch before you
connect the switch to power (see page 336).