Page 73 of 77
6.8. FINAL CHECKS
6.8.1. Ensure that all fasteners are in place and secure.
6.8.2. Walk on the assembled system checking for any undue movement.
6.8.3. Remove any debris and metal chips.
6.8.4. Ensure that the level and slope has not shifted during installation.
6.8.5. Check that all handrail ends are terminated with loops or returned to a guard or building.
6.8.6. Check that all Frame Top Rails are covered with end plugs and ramp side rails have corner
protectors installed.
6.8.7. CONGRATULATIONS! The EZ-ACCESS® TITAN™ System is assembled.