Page 30/31 Maintenance
7 Maintenance
7.1 Servicing
FAFNIR devices are generally maintenance-free.
Only the probes in light liquid separators must be cleaned regularly every 6 months. This can
be done e. g. during the prescribed six-monthly maintenance of light liquid separators.
7.2 Return shipment
Before returning any FAFNIR devices, the Return Material Authorization (RMA) is required.
Please contact your Account Manager or the Technical Support for more information on re-
turning goods.
Mon. to Thu. 07:00 a.m. to 05:00 p.m., Fri. 07:00 a.m. to 04:00 p.m.
The return of FAFNIR devices is possible only with authorization (RMA) by the
FAFNIR Technical Support.
8 Technical Data
230 VAC ±10 %, 50 – 60 Hz, 7.5 VA, or
115 VAC ±10 %, 50 – 60 Hz, 7.5 VA, or
24 VAC ±10 %, 50 – 60 Hz, 7.5 VA, or
Five relays each with potential-free changeover contact
U ≤ 250 V; I ≤ 5 A; P ≤ 100 VA; cos ϕ ≥ 0.7
U ≤ 250 V; I ≤ 0.25 A; P ≤ 50 W
External Acknowledge Button
Potential-free NO present in the power supply
In addition, the technical data specified in the EU-type examination certificate
and the operating instructions must be observed (see appendix).