EasyManua.ls Logo

Fanimation GLIDEAIRE FPD8520 Series - Page 9

Fanimation GLIDEAIRE FPD8520 Series
52 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
How to Assemble Your Ceiling Fan (continued)
9
8. Remove one of the two shoulder screws in the
hanger bracket and retain the screw for later. Loosen
the second shoulder screw without fully removing it.
(Figure 8)
Figure 6
Figure 7
6. Reinstall the hanger ball on the downrod as follows.
Route the red, gray, yellow wires and safety cable
through the hanger ball. Position the pin through the
two holes in the downrod and align the hanger ball so
the pin is captured in the groove in the top of the
hanger ball. Pull the hanger ball up tight against the
pin. Securely tighten the set screw in the hanger
ball. A loose set screw could cause fan wobble.
(Figure 6)
Figure 8
7. Cut off excess lead wire approximately 6 to 9 inches
above top of the downrod. Strip insulation off 1/2 inch
from the end of each lead wire. (Figure 7)
Hanger Bracket
CAUTION
All set screws must be checked, and retightened where
necessary before installation.

Related product manuals