EasyManua.ls Logo

Fermator MOD MC PREMIUM PM - Page 32

Fermator MOD MC PREMIUM PM
120 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
32
MOD MC PREMIUM PM
15
15
2.2 ASSEMBLY INSTRUCTIONS
2
2.2.3 CLEAR OPENING (PL) VERIFICATION AND VALIDATION
2.2.3.2
Once the open position and the synchronization has been adjusted, proceed with the carriages in the closed
position. If the gap between carriages is not 30 mm proceed as shown below.
AIM
Adjust the rubber stops until the distance between the Adjust the rubber stops until the distance between the
carriages and half PL (centre line) is 15 mm on each side.carriages and half PL (centre line) is 15 mm on each side.

Table of Contents