In order to verify the correct position of the clear opening (PL) first place the carriages in the open position.
Adjust the rubber stop until the Adjust the rubber stop until the
distance between carriages and the distance between carriages and the
end of top track is PL + 40 mm.end of top track is PL + 40 mm.
Loosen the screw Loosen the screw
to release the cable.to release the cable.
Before tightening the Before tightening the
cable fastener ensure cable fastener ensure
the correct line-up the correct line-up
between the fast and between the fast and
slow carriages.slow carriages.
3.2 ASSEMBLY INSTRUCTIONS
3
3.2.3 CLEAR OPENING (PL) VERIFICATION AND VALIDATION
Only perform this
action if the dimension
is other than the one
shown below.
AIM