98
MOD MC PREMIUM PM
+
-
0< X <1
4.2.1.1
The egress device is supplied assembled. It’s only needed to put the cable through the terminal, like is shown in the detail
below and tighten the headless screw.
4
4.2.1 EGRESS DEVICE (FROM PIT)
4.2 OPTIONAL COMPONENTS
Once headless screw has been tightened cut off the Once headless screw has been tightened cut off the
cable surplus.cable surplus.
Ensure the fulllment of this measure.Ensure the fulllment of this measure.
AIM