5. Commissioning
5−6
Festo P.BE−MTR−DCI−IO−EN en 0606b
· Switch on the power supply for the MTR−DCI.
When the power supply is switched on, the MTR−DCI
automatically carries out an internal check.
· Carry out parametrizing and commissioning with the
control panel or the FCT, as described in the following
chapters or in the FCT/PlugIn help.
· In order to complete commissioning note the instructions
for operation in the FCT/PlugIn help and in chapter 6.1.