EasyManua.ls Logo

FISCHBEIN F - Unpacking Procedure

FISCHBEIN F
44 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
FISCHBEINCOMPANY
The Leader in Bag Closing Technology
REF : 14810F-GB
ED.A10/2001
13
MAINTENANCE AND SMALL REPAIRS .
WARNING !!!!
Always unplug the machine before starting work .
DAILY MAINTENANCE .
Lubricating the machine in operation .
1. Before closing your first bag be certain to see that the lubrication
mechanism is functioning properly .
2. To speed oil through the machine mechanism you must simply press
the oil pump button 2 or 3 times in succession . You will see the oil
flowing through the feeder tube
as you do . This should be
performed every 2 hours of
machine usage . The wicking
inside the housing carries the
dispensed oil to other moving parts
near the looper and needle bar. Do
not remove the wicking from the
MODEL F. If the wicking (11508)
becomes worn and thin, replace it
immediately.
3. Check the level of the oil pump
regularly . Always fill it genuine
Fischbein machine oil (12800) .
4. Always replace the oil reservoir cap to avoid contaminating the
lubricant.
This could cause the oil lines to plug and prevent lubrication of the
machine parts .
5. We recommend pushing the oil pump while the machine is running to
give better oil distribution inside the machine .
Cleaning of the machine .
Each day , clean the machine of any dust or accumulated debris .
This can easily be done by blowing out the machine cavities with
compressed air or by using a dry bristle brush .

Other manuals for FISCHBEIN F

Related product manuals