EasyManua.ls Logo

FJDynamics FJD 3D - Check before Installation

FJDynamics FJD 3D
25 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Hardware Installation Manual for FJD 3D Excavator Guidance System
8
Copyright © FJ Dynamics Technology Co., Ltd. All Rights Reserved.
Please be sure that you have carefully read the content of Chapter 2 and that the requirements
described in Chapter 2 have been met.
3.1 Check before Installation
Before installation, make thorough plans and arrangements for the installation location, power supply,
and wiring of the equipment. Please verify the following points before installation:
1. Enough space should be provided at the installation location to meet the heat dissipation
requirements.
2. The installation location must meet the environmental requirements of the equipment for
temperature and humidity.
3. The installation location must meet the requirements of the equipment for power and current.
4. The selected power supply must meet the power requirements of the system.
5. The installation location must meet the requirements of the equipment for installation location
selection.
6. For user-specific equipment, please check whether the equipment meets the specific requirements
before installation.

Related product manuals