30
ENG
8. Maintenance
8.1 Maintenance Warnings
Electrical supply must be disconnected prior to conducting any maintenance. To supplement, or in addition to, the
stipulations made in the overall project, perform the following:
12%
2.2 bar
Maintance 1
Maintance 2
Maintance 3
Maintance 4
11-11-2018
11-11-2018
11-11-2018
11-11-2018
Maintenance due date is shown in menu 4.4.
Maintenance 1 is due
Maintenance warnings pops-up when date is due. Warning gets stored in the Current errors/warnings list and Error
logbook.
200 L
12 %
Ext
1 Maintenance is 1 due
Acknowledging the “maintenance 1 is due” Warning in the Current errors/warnings list is equal to resetting the
maintenance 1 due date.
8.2 Maintenance schedule
Objects, standard scope of supply Service activities, measures
Monthly inspection
(No Warning Message)
30 days Compressor, oil-free [25-28]* Inspect and/or clean filter element [30]*, filter casing [30]* &
Air inlet when dirty (dry installation required)
Main vessel [1]*, Auxiliary vessel MK Drain condensate [34]*; Deaerate water compartment
[10]*(NA. for vessels with flex vent [12]*)
Clean particle filter * Clean filter element [30]*, filter casing [30]*& Air inlet [30]*
when needed (dry installation required)
Maintenance 1 365 Days Compressor*, Pressure release valve, Compressor valve 1
& Compressor valve 2.[25-28]*
Function check. To be carried out manually by trained and
certified personnel. Other inspections can be done during
operation of the device.
Control unit [35]*, configuration Inspect and restore the required settings (overview menu)
Main vessel [1}*, auxiliary vessel MK, Compressor module
[25]* & connection assembly[22]*.
Check for leaks at all the connections to the vessel at both
compressed air- and water compartments (visually). Check
externally for damage, deformation or corrosion and restore
operational readiness.
Safety valve[22]* Function check. To be carried out manually by trained
and certified personnel. (DO NOT PRESSURIZE VESSEL TO
SAFETY VALVE LIMITS)
Main vessel [1]*, auxiliary vessel MK Inspect vessel internally! Consider recurring inspections,
see general safety instructions!
Maintenance 2 1825
Days
Carry out strength inspection to vessel!
Maintenance 3 3650
Days
Carry out recurring inspection of electrical equipment!
Maintenance 4 584 Days
* See “5.5 Component parts” on page 14.