7
ENG
4.3 Qualifications required, assumptions
All personnel must have the relevant qualifications to carry out the required services and be physically and psychologically
capable. The area of responsibility, competence and supervision of personnel is the duty of the Operator.
Required service Professional group example Relevant qualifications example
Storage, transportation Logistics, transport, warehousing Transport and warehousing specialist
Assembly, disassembly, repairs, maintenance.
Re-commissioning aer adding or changing
components. Inspection.
Installation and building services HVAC specialist.
First commissioning of configured control unit
(generic), re-commissioning aer power cut,
operation (work on the terminal and Flextronic
control unit)
People with operations room clearance with
knowledge gleaned from this guide.
Electrical installation Electrical engineering Specialist in electrical engineering/ installation
Initial and re-inspection of electrical systems Qualified person (QP) with certification in Electrical
Engineering
Inspection before commissioning and re-inspection
of pressure equipment
Installation and building services engineering
performed in the context of technical inspection.
Qualified Person (QP)
4.4 Sta qualification
Operating instructions are transferred by Flamco representatives or others assigned by them during delivery negotiations or
on demand.
Training for the required services, installation, dismantling, commissioning, operation, inspection, maintenance and repair
are part of the training / further education for service engineers of the Flamco branch oices or named service contractors.
These training courses cover information on required installation conditions, but not their implementation.
On-site services include transportation, the preparation of an operations room with the requisite foundation engineering
to accommodate the system, and the requisite hydraulic and electrical connections, the electrical installation for the power
source of the expansion automat and installation of the signal leads for the IT equipment.
4.5 Appropriate use
Sealed water-based heating and cooling systems in which temperature-induced changes in the volume of the system water
(the heat transferring agent) can be absorbed and the required operating pressure is governed by a separate expansion
automat.
Suitable and equipped for the operation in heat generating systems according to EN 12828, EN 12952, EN 12953. The
Principal / Operator will need to consult with a notified body on additional safety measures.
Use in similar systems (e.g. heat transfer systems for process industry or technologically conditioned heat) may require
special measures.
4.6 Incoming goods
The items delivered must be compared against the items listed on the shipping note and inspected for conformity.
Unpacking, installation and commissioning may be started only once the product has been checked to conform with the
intended use as stated in the order process and contract. Exceeding the permissible operating or design parameters may
lead to malfunctioning, component damage and personal injury.
If not in line with conformity or if the delivery is incorrect in another way, the product must not be used.