EasyManua.ls Logo

flamco Flamcomat MK-U G4 - Maintenance; Maintenance Warnings; Maintenance Schedule

flamco Flamcomat MK-U G4
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Manual Flamcomat MK-U G4
We reserve the right to change designs and technical specifications of our products.
31
ENG
8.3 Vessel draining/refilling.
If draining of expansion water in the main vessel or auxiliary vessels is necessary, please consider the following order of
actions:
Record the actual volume level (%) as shown on FLEXTRONIC control unit display.
Switch the control unit OFF (hold O/I button for 8 seconds).
Close the lockshield valves on the expansion pipe (system inlet and outlet) and on the connecting array (vessel inlet and
outlet)
Close the isolating valve at the top-up connection.
Carry out the required work on the vessel (drain, service, repair etc.).
Switch the control unit ON; Login and go to factory reset* and run Commissioning procedure (overview menu options;
Commissioning 1-1.8)
Aer commissioning the Initial filling procedure is started automatically.
Note: when a refill bigger than the default setting for minimum vessel filling volume is required (6%), If both the main
and auxiliary vessels need filling, open the lockshield valve on each vessel connection. Make sure that the volume level
detection is made by using the volume sensor of the main vessel.
Disconnect the filling equipment.
The operational mode has been restored.
There are 2 questions in this menu item. Only when these are confirmed, the reset takes place.
Caution: At the moment of restarting the system some logical errors may arouse that are self-acknowledging or
acknowledged.
9. Decommissioning, dismantling
At the end of the of the service life or at planned shut-down of the equipment, please make sure that the module is
separated from the power supply. The hydraulic system connections and top-up connections should be closed o.
Caution: water areas should first be made pressure less and empty when the destination or re-use of system water
should be designated in conformity with the applicable rules. This water may be treated, contain anti- freeze or
other additives.
The designation of further processing of the construction parts should be carried out in agreement with the required waste
management service provider
Appendix 1. Technical data, information
Caution: DO NOT STACK!
Ambient conditions
Storage
Room: Protected against: Ambient conditions:
Locked Solar radiation 60 ... 70 % relative humidity, non-condensing
Frost-free Thermal radiation Maximum temperature 50 °C
Dry Vibration Free of electrically conductive gases, explosive gas
mixtures, aggressive atmosphere

Table of Contents

Related product manuals