EasyManua.ls Logo

Flott SB 23 Plus - Machine Installation; Machine Installation Process

Default Icon
99 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation of the Machine
28
04/03/2020 218333
4 Installation of the Machine
The machine usually comes packaged on a small pallet. Bear in mind the
weight of the machine and, if necessary or appropriate, use transport equip-
ment or a second person.
Warning
Danger of falling down of the transported object.
The machine may only be transported by authorized personnel.
Only use transport equipment and transport aids that comply with the rele-
vant safety regulations and have sufficient load-bearing capacity.
The machine may only be fastened, lifted and transported at the designated
points.
Secure the machine against tilting and slipping with suitable transport aids.
Attention
Danger due to swinging loads.
The machine must be transported without swinging. Every contact with ob-
stacles must be avoided.
Make sure that nobody is in the danger zone or under the machine during
transport.
1. Insert a suitable metal rod through the hole in the adapter
so that you can attach straps to its ends.
2. Attach the straps in each end of the metal bar.
3. Use a suitable hoist to carefully lift the machine by the
straps and move it to the desired installation location.
Make sure that the machine is raised vertically and not
pulled diagonally to the side.
4. Carefully deposit the machine and remove the straps and
metal rod.
5. Align the machine to its final position.

Table of Contents

Related product manuals