PostBase mailing system with Dynamic Scale
24
Step 7: Setting up the mailing system
Positioning the system components • Place all system components in the
intended positions. The illustration shows
the correct arrangement and orientation of
the system components.
You can find information on the requirements
applicable to the installation site on page 15.
Assembly When assembling the mailing system, ideally
proceed from left to right (starting at the
Ramp plus).
The individual components of the mailing
system are mechanically coupled with
‘catches’ (each on the right housing side) and
‘slots’ (each on the bottom side on the left)
and are secured in position relative to each
other in this way.