EasyManuals Logo

Froling FHG User Manual

Froling FHG
54 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #24 background imageLoading...
Page #24 background image
First Start-up
Page 24
B0600008_US v
4
3.1.4 Operation status of Boiler Control System
Check Graphic Display at Boiler Control System for actual
operating mode
If operating mode is “Off” procedure 3.3, Heat up the boiler has
to be carried out
“Refueling” usually takes place at the end of operating mode
“Heating”. Refer to 3.4 Refueling the boiler
For behavior in all other operating modes please refer to
4.1.3 Operating modes
3.1.5 Starting the boiler for the first time
Put one log diagonal into the
Fuel Loading Chamber
Put a first layer of log wood at
the diagonal log
Cover these log wood with pieces of uncoated paperboard
Add one additional layer of logs into the Fuel Loading Chamber
Close Filling Chamber Door

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Froling FHG and is the answer not in the manual?

Froling FHG Specifications

General IconGeneral
BrandFroling
ModelFHG
CategoryBoiler
LanguageEnglish

Related product manuals