Boiler Maintenance
Froling GmbH, Industriestraße 12, 4710 Grieskirchen, AUSTRIA Page 45
www.froling.com B0600008_US
Checking the primary air openings
Open the Insulation Door and Fuel
Loading Chamber Door
Unhinge the cladding plates
Check the primary air openings (C)
for unobstructed air-flow
If necessary, clean the openings
Cleaning the Smoke Extraction Duct
Switch off Main Switch
Open the Insulation Door and Fuel
Loading Chamber Door
Clean the Smoke Extraction Duct with a
small brush
Combustion gases are sucked out when
the Insulation Door is opened!
Take care not to push the brush into
the Induction fan!
Checking the tightness of door gaskets
Close the respective door and check its
gasket
Check gasket (D) for perfect
alignment on the door frame
Imprint in the gasket
If the gasket is colored black at several
points or the imprint is interrupted:
The gasket is no longer efficient.
Replace the gasket
Checking the Draft Regulator and blowback flap
Check the Draft Regulator and blowback flap for faultless operation