Installation
Assembly work
Fröling Heizkessel- und Behälterbau Ges.m.b.H, Industriestrasse 12, A-4710 Grieskirchen Page 17
Tel +43 (0) 7248 606-0 Fax +43 (0) 7248 606-600 info@froeling.com www.froeling.com
M1010108_en
3
U Insert the ignition fan with safety guard in ignition sleeve and hand
tighten the retaining screw
Take care not to damage the igniter.
U Fit the flush-back hose to the ignition fan using a hose clamp
U Lay the hose to connect to the chamber and secure using hose clamp
U Attach insulation on grate shaft side
as illustrated
Ensure that the fitted screws
engage securely in the spring
shackles.
U Attach the front chamber insulation
Ensure that the fitted screws
engage securely in the spring
shackles.