EasyManua.ls Logo

Fronius TransSteel 2200 - Installation and Initial Operation

Fronius TransSteel 2200
64 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installing the
motor plate
(2) (3)
(1) (2) (3)
1
Align the holes (2) on the motor plate
(1) with the locating pins (3) in the
power source
2
Gently push the motor plate (1) in until
it engages
(5)
(4)
3
Fit the motor plate using three TX25
screws (4)
Tightening torque = 1.5 Nm
4
Position the drive in the motor plate
and fit using three M5x12 mm PH2
countersunk screws (5)
Tightening torque = 2.1 Nm
5
Fit the wearing parts and close the
cover
(6)
(6)
6
Fit two TX25 screws (6)
Tightening torque 2.1 Nm
41
EN

Table of Contents

Other manuals for Fronius TransSteel 2200

Related product manuals