Connecting the Wattpilot
General informa-
tion
CAUTION!
Installation and commissioning may only be performed by a qualified electrician.
Requirements for the qualification of electricians - knowledge and observation of the 5
safety rules for working on electrical systems.
Disconnect.
Ensure the device cannot be switched back on.
Ensure the system is no longer live.
Carry out earthing and short-circuiting.
Cover nearby live components or make them inaccessible.
NOTE!
Duty to inform the grid operator!
Check with the grid operator whether there is a duty to inform in the country of des-
tination and, if necessary, report the Wattpilot to the grid operator.
Installing the
Wattpilot HOME
11 J
When installing the Wattpilot HOME 11 J, the mains cable must be installed by a quali-
fied person in accordance with national standards. The fuse protection for the mains lead
must be dimensioned in accordance with the device technical data.
WARNING!
Danger from mains voltage!
An electric shock can be fatal.
Always make sure the circuit is disconnected and de-energised before carrying out
any connection work.
The connection may only be established by an authorised electrician.
Observe the national standards.
1
Disconnect the circuit from the power sup-
ply before carrying out any connection
work.
34

Other manuals for Fronius Wattpilot Go 11 J

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Fronius Wattpilot Go 11 J and is the answer not in the manual?

Fronius Wattpilot Go 11 J Specifications

General IconGeneral
BrandFronius
ModelWattpilot Go 11 J
CategoryBattery Charger
LanguageEnglish

Related product manuals