EasyManua.ls Logo

Fujitsu CELSIUS H7510 - Removing the Touchpad Buttons Sub Board

Fujitsu CELSIUS H7510
52 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 28 of 52
Only intended for authorised service technicians
Removing the touchpad buttons sub board
Required work steps:
Removing the battery
Removing the service door
Removing the 2.5” HDD
Removing the LTE module
Removing the WLAN module
Removing the lower assy
Required tools:
Screwdriver: Phillips PH00
Remove both screws M2.5XL6 (yellow circles).
Open all connector locks (green arrows) upwards and remove the flexprint cables.
Remove the sub board (orange arrow).
Return to Table of Contents

Other manuals for Fujitsu CELSIUS H7510

Related product manuals