Getting started
Installing the cable cover (optional)
• All necessary lines are connected to the device.
• All necessary measures to protect property and data have been taken (see
"
Propert y and data protection", Page 35).
The cable cover is constructed as follows:
Platzhalter 1:
für Montage wichtige
Bauteile der Abdeckung
a
a
b
c
a = Locking elements
b=Guiderail
c = Cable opening
► On devices with a housing lock: Unlock the casing.
22 Fujitsu