2. Installation
Installing in a Rack
FUJITSU Storage ETERNUS AF, ETERNUS DX Configuration Guide (Power Synchronized Unit)
Copyright 2019 FUJITSU LIMITED P3AM-8012-14ENZ0
39
■ Procedure for installing an AC sensor unit
1 Open the front and rear doors of the rack.
2 Attach the M6 cage nuts to the rear rack pillar.
• Attachment positions
Insert four M6 cage nuts in the 1st and 3rd holes above the AC sensor unit base line.
• Attachment procedure
Clip the M6 cage nut tabs into the desired hole from the inside.
3 Attach the L-shaped brackets to the AC sensor unit.
Use four M3 cross recessed head screws with captive washer to attach the L-shaped brackets to the AC sen-
sor unit on both sides.
(Rear rack pillars)
Base line of AC sensor unit
1st position
3rd position
1U (AC sensor unit size)
Top view
M6 cage nut
Rack pillar (square)
M3 cross recessed head screws
with captive washer
L-shaped bracket
L-shaped bracket
M3 cross recessed head
screws with captive washer