EasyManua.ls Logo

Fujitsu Eternus DX90 S2 - Page 51

Fujitsu Eternus DX90 S2
147 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 3 Rack Installation
3.1 Installing Power Distribution Unit (For Regions other than EMEA&I)
ETERNUS DX80 S2/DX90 S2 Disk storage system User’s Guide -Installation-
Copyright 2013 FUJITSU LIMITED P3AM-4832-07ENZ0
51
2 Install the power distribution unit in the rack.
Fasten it to the prepared holes in the pillars with eight M5 screws.
3 Attach the blank panel to the rack front.
The blank panel should be attached at the same height as the power distribution unit.
End of procedure
(Rear rack pillars)
M5 screws
M5 screws
(Rear rack pillars)
(Front rack pillars)
Blank panel
Power distribution unit

Table of Contents

Other manuals for Fujitsu Eternus DX90 S2

Related product manuals